Tuesday, October 8, 2019
The Nature of the Industry Essay Example | Topics and Well Written Essays - 4000 words
The Nature of the Industry - Essay Example This paper purports to determine the nature of the engineering and construction industry in UK. The engineering and construction is considered as one of the most complex and hazardous form of industries. This involves various workforces from skilled to unskilled since it entails different and numerous ranges of activities starting from the design to construction stage as well as during the productive use of the built environment. Basically, engineering and construction involves complex and critical operation process. Hence, it includes various construction personnel who works together in order to complete a built structure based on clientââ¬â¢s specifications, costs, time and building standard quality. Usually, the team is consists of the following personnel: Architect, Mechanical and Electricity Engineer, Site-Based Cost Control Surveyor, Site Engineer and Site-Based Environmental manager. As cited in APUC, these personnel have their own specific tasks and responsibilities to per form in every stage of the built environment projects and they are the ones accountable and liable to these tasks in case errors or defects emerged. In engineering and construction, the architect plays a very crucial and important role because he/she will lead the design and planning team of the built environment project. The architect is the one accountable in the conceptualization of the design up to the provision of detailed floor plans and sets of building construction drawing designs which is necessary to start the actual construction of the project. The purpose of the design stage of building construction is to integrate the requirements specified by the client according to the project budget and timescale as well as to assess the possible occurrence of design risks. In addition, it is also the responsibility of the architect to look the overall coordination of the built environment design including space planning, appearance, and materials/equipment used in construction and t he furniture to be placed in the built structure upon its completion. The architect will work hand-in-hand with the site engineer during the construction phase to ensure that all the requirements specified in the design are properly installed and able to meet the clientââ¬â¢s design preferences (APUC, 2007). Mechanical and Electricity Engineer The mechanical and electricity engineer is the one responsible in ensuring that the electrical and mechanical facilities and equipment to be installed in the built environment are environmentally sustainable which features energy efficiency use. The purpose is to minimize the consumption of energy to lessen/reduce carbon emission. In addition, the M & E Engineer is also the one responsible in the estimation of cost related to his/her specific task, which in turn forwarded to the Cost Control Surveyor for cost planning. The M & E Engineer will closely work with the Architect and Site Engineer in order to ensure that the
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment